Hari, Budi Prasetya (2026) Analisis Strategi Pemasaran Pelaku Usaha Hasil Tambang Dalam Persaingan Proyek Nasional Pembangunan Bandara KASA Situbondo. Other thesis, Universitas Abdurachman Saleh Situbondo.
|
Text
JURNAL SKRIPSI HARI BUDI PRASETYA LENGKAP.pdf Download (126kB) |
||
|
Text
JURNAL SKRIPSI HARI BUDI PRASETYA LENGKAP (1).pdf Download (254kB) |
||
|
Image
IMG20261104122708.jpg Download (5MB) | Preview |
Abstract
This study aims to analyze the marketing strategies implemented by mining-material business actors in facing competition for the national strategic project of KASA Airport development in Situbondo and to identify factors supporting and inhibiting marketing success. This research used a descriptive qualitative approach. Data were obtained through in-depth interviews, observation, and documentation, with Solehudin, S.T., Director of PT Sarana Bangun Nirwana, as the main informant. The findings show that the marketing strategy is implemented through product, price, place/distribution, and promotion dimensions. Product strategy is the most dominant dimension because project acceptance is strongly determined by material quality, variety, specification conformity, consistency, and supply availability. Price competitiveness is also important, while distribution is supported by the geographical proximity of the business location, transportation capability, and production facilities. Promotion is conducted mainly through business networks, project experience, communication, portfolio, and word-of-mouth relationships. Supporting factors include mining legality, IUP Operasi Produksi, WIUP of approximately 9.80 hectares, stone-crusher facilities, product diversity, previous infrastructure-project experience, and geographical proximity to the KASA Airport project. Inhibiting factors include competition with larger companies, large-volume requirements, technical specifications, price competition, delivery constraints, and administrative requirements. The study concludes that marketing success is determined not only by ownership of mining resources but by integrated project readiness involving product quality, supply capacity, competitive pricing, timely distribution, legal compliance, project networks, track record, and trust.
| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | H Social Sciences > HB Economic Theory |
| Divisions: | Fakultas Ekonomi > S1 Manajemen |
| Depositing User: | HARI BUDI PRASETYA |
| Date Deposited: | 04 Nov 2026 04:49 |
| Last Modified: | 04 Nov 2026 04:49 |
| URI: | http://repository.unars.ac.id/id/eprint/5182 |
Actions (login required)
![]() |
View Item |

